Following the automation of manufacturing processes in industry, the fourth industrial revolution is addressing digital connectivity and communication between manufacturing, but also quality assurance systems, i.e., NDT or NDE systems.
There are multiple ways to speed up a TFM inspection. But there’s one novel and unique method that speeds up data collection while maintaining the sensitivity and meeting the amplitude fidelity requirements for TFM code compliance.
Accreditation is critical to ensuring there is an effective quality management system that affords greater process control, reduces risk, and ulitmately results in increased customer satisfaction. And, thanks to the pandemic, it got a little easier.
One of the segments likely to face the greatest challenges in 2022 are automotive plastics manufacturers who will continue to face shortages of the raw materials, composites and resins required for both interior and exterior vehicle parts.
The information presented herein is intended to be of a general nature and so can be applied to most employer-based certification programs. It is intended for those who may not have a great deal of familiarity with the nuances of NDT certification records or programs.
Advanced nondestructive inspection methods like ECA are not only used to validate the integrity of aging equipment, but also play an important role in the development of maintenance procedures for new components and assets.
As the pendulum swings from past decades of customized PLM to a far more flexible, highly-configured version, organizations need to borrow a page from modern software development and embrace automated testing as part of routine deployment.
Engaging an audience on the technical aspects of quality work can be a challenge: inspection, audits, and measurement systems analysis are hardly the stuff of a lecture that you will find gripping and inspirational.
Disruptions to your testing program can result in delayed shipments, upset customers, and lost revenue. For this reason, it is crucial to ensure that measures are being taken to prevent system downtime when planning the introduction or evolution of your testing program.